Large Cavitation Tunnel

The Large Cavitation Tunnel was master-planned by the Ocean University, incorporating basic design from the Swedish Ship Research Laboratory (SSPA), detailed structural design by the Ship and Ocean Industries R&D Center (SOIC), and noise control design by the university. It was manufactured by Taiwan Shipbuilding’s Keelung Plant and completed its basic performance testing in April 2002. The facility consists of a six-story building with two underground levels and four above-ground floors. The Tunnel body is entirely constructed of SUS 316 stainless steel, with an empty weight of approximately 470 tons and a total weight of approximately 1,400 tons when filled with water.

Center for Acoustic Studies

The “Acoustic Testing Center – Zhao Kui Building” of the Department of Systems Engineering and Naval Architecture at National Taiwan Ocean University is a noise testing facility accredited by the Taiwan Accreditation Foundation (TAF) under ISO/IEC 17025:2005 and certified by the Environmental Protection Administration as an environmental testing institution.

National Museum of Marine Science & Technology

The NMMST encompasses an area of over 500,000 square meters in the city of Keelung’s Badouzi Harbor. The Museum Complex, which includes the Main Exhibition Building, Ocean Theater, and the Regional Exploration Building, features detailed exhibitions pertaining to marine science, technology, ecology, and culture.